Bryn Mawr Trust (BMT) purchased this 3-story, 18,000 SF facility to accommodate 80-90 office employees in their Loan, Commercial Lending, and Credit Administration departments. The layout includes conference rooms, breakout spaces, private offices, and public office spaces.
MEP/FP Special Features
Heat recovery Variable Refrigerant Flow (VRF) systems with energy recovery ventilators for the code-required outside air/exhaust air requirements
Zone dampers were utilized with the VRF systems to allow for enhanced temperature control of the spaces
80 kW, natural gas-fired generator provides full-building standby power to maintain operation during a utility outage